How we Build Walls & Double Walls

To really obtain full air sealing on concrete walls, we taped the Stego to the wall first, then overlapped the Mento, primed and taped that joint as well. Below are the finished seals that will be hidden by the plywood sheathing.

Despite using a lot of foam under and around the slab, we tried to avoid using any spray foam at all in the entire building (window installation do require small amounts of foam, however). This was possible by use of a double stud wall that we could then dense pack with cellulose.

Our framing contractor, Kevin, really enjoyed building walls twice! Our wall thickness from outside of stud to outside of stud is 18″ which allowed for over R66 wall insulation, including a continuous layer (no framing).

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

Sheathing, Second Floor, and Why We have an I Beam?