Sheathing, Second Floor, and Why We have an I Beam?

To finalize the lower part of our exterior air barrier (where the plywood sheathing meets the concrete wall), we ran the plywood below the seam of where we originally taped the Stego and Mento to the wall.

Using a primer again, we primed the concrete wall and then taped the plywood to the primed wall with 4″ Tescon tape. This left us with a really solid air barrier that we can eventually hide with cladding.

We capped the top the double stud wall with plywood allowed for a nice top to the cavity for fill insulation.

In order for our floor plan to work, we needed to carry the load of the second floor wall which runs over our bump out for the living room. The beam was sized, and we ran it between two load points. Both load points were inside the the thermal envelope, so we avoided any massive thermal bridges to exterior walls.

Lara Dickson

ABOUT THE AUTHOR

Hailing from Vermont, USA, Lara Dickson is a ravenous Squarespace designer and enthusiast, Certified Squarespace SEO Expert, Squarespace Circle member, graphic designer, former organic vegetable and heritage breed pig farmer.

deepdishcreative.com

Previous
Previous

First Blower Test and Second Air Barrier Test

Next
Next

How we Build Walls & Double Walls